Economic Rules Hub
  • World
  • Politics
  • Business
  • Investing
Home Investing TNC Accelerates Mining Activities at Wallace North, QLD
Investing

TNC Accelerates Mining Activities at Wallace North, QLD

by admin August 13, 2024
August 13, 2024

True North Copper Limited (ASX:TNC) (True North, TNC or the Company) is pleased to announce it has successfully progressed mining activities at the Wallace North deposit, part of its Cloncurry Copper Project (CCP) in Queensland1, and commenced first ore block mining from the 180 bench yesterday.

HIGHLIGHTS

Mining activities at TNC’s Wallace North deposit, part of its Cloncurry Copper Project (CCP) in Queensland, continue to successfully ramp upTNC is on track to become Australia’s next copper producer and critical metals supplier via its restart of CCPMining activities remain on schedule according to TNC’s current CCP mine plan with a total of 52,000 BCM of overburden mined to dateOxide ore is now exposed in the open cut pit with mining of first ore undertaken in the last 24 hours as depicted in the supporting photographs. Oxide ore from Wallace North will be hauled via road to TNC’s Cloncurry Operations Hub (COH) for crushing and placement onto the heap leach padsCCP is estimated to generate free cash flow of ~$200 million at current copper spot prices over its initial 4.6-year mine life

TNC last month announced the commencement of mining activities at Wallace North, one of four open-pit deposits making up CCP. Wallace North has an Ore Reserve totalling 0.7Mt (Probable) grading 1.01% Cu and 0.46g/t Au for 6.8kt Cu and 10.0koz Au2.

Ore will be transported to TNC’s Cloncurry Operations Hub for crushing and stacking to existing Heap Leach pads. Irrigation of the ore will follow soon after and contribute to improved copper production from the Solvent Extraction (SX) plant.

TNC has a binding offtake agreement with global commodity trader Glencore for 100% of copper concentrate produced at CCP3.

COMMENT

True North Copper’s Managing Director, Bevan Jones said:

“We are delighted by the progress made by our team at Wallace North following the mining restart last month. TNC is moving closer to becoming Australia’s next copper producer with first ore mined and delivered to the RoM pad. Wallace North ore is expected to start being transported to our Cloncurry processing hub this month. This progress is a testament to the hard work and commitment of our team at CCP and provides momentum for the Company as we near this major milestone.

‘Our steady progress strengthens TNC’s position as an emerging copper and critical metals company based in North Queensland. With significant newsflow ahead on this front, we look forward to providing regular updates on mining activities at CCP.”

Wallace North Mining Update

The mining ramp-up at Wallace North has initially focused on building ore stockpiles. Since TNC announced the commencement of mining activities at Wallace North4 (refer ASX Announcement dated 1 July 2024), the Company has mined a total of 52,000 BCM of overburden and is on schedule with the current CCP mine plan.

TNC’s personnel is operating dry hire equipment at Wallace North to undertake the mining activities. Dewatering of the pit area has advanced in front of mining activities, with all blast hole drilling undertaken in dry holes.

The Company has exposed the oxide ore in the Wallace North open cut pit and is now stockpiling first ores on the Wallace North RoM in preparation for road haulage in the coming weeks. Oxide ore will be transported by road train to TNC’s Cloncurry Operations Hub’s (COH) heap leach. Sulphide ore will be transported to a nearby concentrator for toll treatment under TNC’s toll-milling agreement with Glencore International AG.

The COH is 2km from the town of Cloncurry in northern Queensland and will service all four of TNC’s deposits with essential infrastructure, technical systems and support. An active oxide heap leach and solvent extraction (SX) processing plant, mine buildings, site administration facilities, workshops, open pit mine facilities, onsite explosive magazines, site storage, water management systems and existing site power supply are located at the COH.

Click here for the full ASX Release

This post appeared first on investingnews.com

0
FacebookTwitterPinterestEmail
previous post
Rights Entitlements Offer – Registry Enhancement and Shareholder Engagement
next post
Putin lashes out at West over Ukrainian incursion into Russian territory: report

Related Posts

Element79 Gold Corp. Comments on Peruvian Government Reform Centralizing Oversight...

May 23, 2025

Purepoint Completes Initial Drill Program Along Groomes Lake Conductive Corridor...

May 23, 2025

Silver47 Announces Graduation to Tier 1 Status on the TSX...

May 23, 2025

Harvest Gold Soil Sampling Program Reveals Several New Gold Targets...

May 23, 2025

Thick High-Grade Graphite Drilling Results In New Zone

May 23, 2025

Group Eleven Announces Uplisting to OTCQB Market

May 23, 2025

    Get free access to all of the retirement secrets and income strategies from our experts! or Join The Exclusive Subscription Today And Get the Premium Articles Acess for Free


    By opting in you agree to receive emails from us and our affiliates. Your information is secure and your privacy is protected.

    Recent

    • German tourist carrying ancient Roman artifact on e-scooter chased by Italian police

      May 23, 2025
    • Trump’s image of dead ‘white farmers’ came from Congo, not South Africa

      May 23, 2025
    • Prince William’s new docuseries spotlights ‘one of the most dangerous jobs on the planet’

      May 23, 2025
    • Germany deploys permanent troops to another country for the first time since World War II

      May 23, 2025
    • China says Trump Harvard ban will ‘tarnish’ US image as students caught in crosshairs

      May 23, 2025

    Categories

    • Business (1,368)
    • Investing (3,298)
    • Politics (4,431)
    • World (4,337)
    • Email Whitelisting
    • Terms and Conditions
    • Privacy Policy
    • Contacts
    • About us

    Disclaimer: EconomicRulesHub.com, its managers, its employees, and assigns (collectively “The Company”) do not make any guarantee or warranty about what is advertised above. Information provided by this website is for research purposes only and should not be considered as personalized financial advice. The Company is not affiliated with, nor does it receive compensation from, any specific security. The Company is not registered or licensed by any governing body in any jurisdiction to give investing advice or provide investment recommendation. Any investments recommended here should be taken into consideration only after consulting with your investment advisor and after reviewing the prospectus or financial statements of the company.

    Copyright © 2024 EconomicRulesHub.com | All Rights Reserved

    Economic Rules Hub
    • World
    • Politics
    • Business
    • Investing